It is not known how early Honda and Fujisawa had been talking over this new plant construction project. It is certain that the project was already in motion when Honda ordered Shirai to go to Europe. The products made by Honda were on the verge of becoming acceptable around the world. What was needed next was a production plant capable of producing them in large quantities.

Honda's previous investment in imported machine tools had been a major gamble, but this new plant construction project was an even greater undertaking, and the company's future was on the line.

"The board officially presented me with three basic requirements," Shirai recalled. "The first was 'that this be a mass production plant utilizing rational methods of a kind that have never been realized before.' The second was 'that no limit is set on the amount of money to be invested, but the investment must be recouped within two years.' The third requirement was 'that the plant be harmoniously integrated into the local community.' The second condition that Mr. Fujisawa laid out to me during the board meeting was the pure expression of his approach to plant operation grounded in his unique business experience. The first and third conditions for my taking on the plant were likewise the pure expressions of Mr. Honda's ideals and philosophy. So, you see, the various conditions clearly express the personalities of these two men. Mr. Fujisawa very firmly put a lid on any further discussion by the members of the board, and so made it possible to set conditions that would allow me to do everything I would need to do. At first I felt stiff all over, but then I settled down with the strong sense of determination that I would repay their confidence in me."

Toward the end of July, a Suzuka Construction Project Office was established. The four members who first gathered at the office in the Saitama Factory were Takao Shirai, Sadao Shiozaki, Kotohito Takahashi, and Tsuneko Oshima. They set up a liaison office in the Kanbe area of Suzuka City to serve as a local base.

They moved into action immediately. The first order of business was to apply for permission to convert agricultural land to industrial use. Shirai recollects:

"Japan during that period was still trying to expand agricultural production, so the kind of reduction in agricultural use of land we see today was unthinkable. The primary purpose for land was agriculture, so we knew that the Ministry of Agriculture and Forestry would not easily approve our application. Ten years earlier, soon after I joined Honda, I had worked very long and earnestly on the report to go with the company's application to the Ministry of International Trade and Industry for a subsidy. Since then, however, I had grown rather shameless. This time, I decided to put on a flamboyant show of what we had. Nothing concrete had even been decided yet, and we didn't know just what kind of plant it was going to be, but I went ahead and wrote the application as if we did. So I gave them a pretty big show, about 33,000 m2 in size," he added, laughing. "I made it so that the Ministry of Agriculture and Forestry would understand that Honda was using the large parcel of land for this kind of purpose, and accept that the application was valid. I took that over to the Ministry of Agriculture and Forestry and to the Ministry of International Trade and Industry, and the application was approved."

The next order of business was to get down to concrete work on the actual project itself. Shirai remembered:

"We were deadly serious about this. I would have to decide on the basic layout myself. For this, I had to think carefully about many different issues in combination, including how the plant should first start operating and what stages of expansion should be planned for at how many years in the future. With a view to future expansion, I would need to ask the city whether a junior high school located on the property slated for later acquisition could be rebuilt on a nearby hill at Honda's expense. I went to talk with Mayor Sugimoto, explaining our desire to expand the plant later, and obtained his definite approval. We grew even more intensely busy."

Decisions were made to have the Kintetsu train line extended to Hirata-cho, and to purchase property for water supply facilities.

Meanwhile, it was also necessary to make plans to satisfy Fujisawa's condition that "the investment will be recouped within two years." Shirai says:

"The period was two years, but we could never make that time limit if we waited until the plant was completed. What we could get started moving most quickly was an engine assembly line. Our idea was to set up a temporary plant at the parts receiving center and bring that on line in April 1960. Our production plan called for finished vehicles to start coming off the line in the main plant from August."

Shirai's team had to move quickly to realize the dream-like vision of "a mass production plant utilizing rational methods of a kind that have never been realized before." Shirai went on:

"We made this plan on the basis of a reverse concept starting with recouping of the investment. After all, this was our greatest concern. It seemed unlikely that we could manage to recoup the investment within two years by running just two shifts. If we were dealing with three shifts, then it would be better to build a windowless, totally air-conditioned plant so that weather conditions, differences between night and day, and differences in temperature would not affect our employees. The notion of plant construction commonly accepted in Japan at that time, meaning a steel-frame structure with a slate roof, would not work for us. We needed a ferroconcrete steel-beam structure. Construction costs would be higher, but we were aiming for a plant that could function ten and twenty years into the future. So we went ahead. I reached the conclusion that we would not work from the usual Japanese sense of scale."

Then there was one more major issue, "that the plant be harmoniously integrated into the local community." Shirai further reminisces:

"A plant that is not bound to the local community is not a plant for the future. We thought about the people who would be coming to tour the plant, and decided to build an observation corridor on the second floor. However, Mr. Honda's idea of harmonious integration with the community meant much more than that. Ever since the Shirako Plant was built, he had been very fastidious about not allowing Honda plants to disturb the surrounding community. As we would put it today, a plant should harmonize with the area and with the local environment. However, Mr. Honda's ideas on this were more than just a facade. He truly believed that we have to get along well with our neighbors. The question was, how to make this happen at the Suzuka Factory. This was another major assignment for us."

Shiozaki had himself experienced Honda's care and concern for the local community on various occasions. As he recalls:

"An eel restaurant proprietor who lived near the Shirako Plant came to us and complained that the engine durability tests made so much noise that he couldn't sleep. The engines were running 24 hours a day, so it was no wonder that someone complained. Then one day the Old Man heard about it, and he said, 'I want you to be working, but I don't want it in such a way as to trouble our neighbors. Do something about it!' So we said, please stop the engines so we can do sound-proofing work, and, 'Idiot!' he said, 'If it was just a matter of turning off the engines, I wouldn't ask you! ' So then there was nothing else we could do. We built another large structure right on top of the building containing the engine testing laboratory, to cover it," said Shiozaki, laughing. "We stuffed fiberglass into the space between the two structures. While we were doing this, all we heard from him was, 'Do it soon. Do it fast. Do it today.'"

The employees were also encouraged to submit ideas for the new plant. Many suggestions from the shop floor were incorporated into the designs.

Shirai gathered a carefully selected group of employees in the Suzuka Construction Project Office. At the core of the management section was Masami Suzuki. The cost that Fujisawa had specified for the Super Cub to be built at Suzuka was about 20% lower than the Saitama Factory's production cost. The total construction cost at Suzuka, including company housing, dormitories, and so on, would require 4,500 million yen.

"I had Mr. Suzuki thoroughly calculate our cost projections," Shirai recalled. "The bottom line was that we would have to produce 60,000 units a month. Two years would still be nearly impossible, but I judged that we could recover the investment in two years and four months. This would extend four months past the deadline set by Mr. Fujisawa, but I concluded that expenses should not be reduced for that reason alone."

In September, construction work began at a rapid pace. On the 26th of that month, however, that area of Japan was assaulted by Typhoon Ise Bay, which was said to have been the most powerful in the history of meteorological measurement. Shirai remembers:

"The first report came in from Mr. Shiozaki. The gravel that was especially vital for foundation work had all been taken to repair flooding damage, and they couldn't get any more. I replied that delay was unacceptable, and construction could proceed if they could obtain 70% of the total amount required. Then Mr. Shiozaki managed by extremely hard work, which hardly allowed him any sleep at night, to obtain gravel from the Yasu River in Shiga Prefecture and from as far away as Kyoto. Despite the occurrence of a problem of this magnitude, the project schedule was not delayed. This was thanks to the people on the spot."

Shiozaki implemented thoroughly unconventional ideas in order to speed up the work. Shiozaki recollects:

"The construction company's architectural blueprints for the plant were delayed. If they were going to be one month late, we would either have to pour concrete now or face another month's delay. So they drew up just the blueprints of the foundation for us. We decided on a column interval of nine meters and proceeded rapidly with the work. About the time that the concrete had dried, the building blueprints were ready, so we were able to go ahead and start the construction work. This is the kind of idea you come up with when you follow the Old Man's way of thinking. You won't find it coming out of someone who thinks conventionally," he laughed.

A number of suggestions and ideas for the project had been collected from Honda's various workplaces. Shiozaki worked these into the foundation laying that had already begun and created a layout drawing for the 36,300 m2 plant. He then turned that into a three-dimensional rendering from an aerial perspective that would allow the entire layout to be grasped readily.

In January 1960, the building blueprints and layout were completed. They depicted a windowless, fully air-conditioned plant of an advanced kind never before seen in Japan's motor vehicle industry or any other industry. Shirai says:

"Before we started on the layout, Mr. Fujisawa told us, 'I expect you to make this a plant exclusively for Super Cubs.' I replied that no, we were thinking of automobile production in the future. When he heard that, Mr. Fujisawa got very angry. He said, 'I've never considered having anything whatever to do with four-wheeled vehicles. Just confine your thinking to the Super Cub.' I could understand that, too. However, I had been working together with Mr. Honda continuously ever since the Hamamatsu days, and the cherished hope of his life covered more than just motorcycles. I was sure that his dream extended to automobile manufacturing. I wanted to realize Mr. Honda's dream for him on this site and in this plant. No matter what Mr. Fujisawa said, this was one thing I intended to accomplish."

As it turned out, he did not deviate from his professed aim.

Nor did Fujisawa issue further orders for him to stop.

The Suzuka Factory was designed to be an optimal mass-production facility for the Super Cub. However, it was from the very first given the flexibility to make automobile production possible there, if the time came for that.

Honda looked at the layout and listened to the detailed explanations by Shirai and other members of his team. The die casting plant had been located with consideration for the people living in the area, and so, had even included research on prevailing summer and winter winds. The company housing and dormitories were not placed all together, but were dispersed throughout the community. No cooperative store just for company employees would be built. Apart from a clinic in the plant, employees needing medical care would be directed to local hospitals. And, beyond these and other, similar measures, the plant did not have a wall surrounding it to separate it from the outside world. Instead of a wall, trees and greenery would be planted.

This plant held resolutely to the concern for harmonious integration with the community that Honda had wanted to see.

The Suzuka Factory entered into operation in April 1960. As Shirai had forecast, the initial activity was engine assembly. The Super Cub C102 with a self-starter also appeared in April, and the bike's popularity grew yet greater. Its sister bike, the Sports Cub C110, made its debut in November.

In May, Honda underwent its ninth capital expansion. Its capitalization was now 4,320 million yen.

In July, Honda's R&D Center was given an autonomous status to become Honda R&D Co., Ltd.

In December, the company launched the CB72 Super Sports bike (a sister to the C72 put on sale in February). This motorcycle would go on to define the new category of sports bikes in Japan.

Super Cub production grew rapidly, passing the one million unit mark as early as June 1961. In August of that year, production of all Super Cub models was transferred from Saitama to the Suzuka Factory, which continued in operation at full capacity as a mass production plant on a hitherto unprecedented scale.

Honda had taken its first step toward mass production at the Yamashita Plant, just 330 m2 in area, in 1948. Now, thirteen years later, the full reality of its cherished idea had been achieved.

During those years, the company had consistently held to a course of self-determination and independence. Now, looking back at that period of time, it was revealed as an unending series of challenges. For that reason, it had been an era of dramatic change filled with repeated failures and successes. Nevertheless, the dreams embraced by Soichiro Honda and Takeo Fujisawa were brought to fruition by young people who pursued the same dreams with them.

However, Honda had not reached its final goal. Its unfulfilled dreams are to unfold boundlessly.

The generation of those who lived through the events of that period join their voices in unison, saying:

"The young people of today will probably not have the same experiences that we did. Although the times may change, the basic Honda philosophy holds true. As we did in the past, the people of Honda today and in the future inherit it and pass it on to the ensuing generations. So long as this continues, Honda will not be just a major corporation. It will always go on being Honda. After all, youthfulness and dreams exist in every age."

Page Top

Honda Worldwide site

Home | Site Map | Site Index | About this Site

Copyright, Honda Motor Co., Ltd. and its subsidiaries and affiliates. All Rights Reserved.